翻訳と辞書
Words near each other
・ Aeschremon ochrealis
・ Aeschremon similis
・ Aeschremon tenalis
・ Aeschrion
・ Aeschrion of Pergamon
・ Aeschrion of Samos
・ Aeschrion of Syracuse
・ Aeschronectida
・ Aeschrostoma
・ Aeschrotes
・ Aeschylus
・ Aeschylus (disambiguation)
・ Aeschylus of Alexandria
・ Aeschylus of Rhodes
・ Aeschynanthus
Aerotrain (KLIA)
・ AeroTrain (Washington Dulles International Airport)
・ Aerotrans Airlines
・ Aerotrim
・ Aerotropolis
・ Aerotropolis (album)
・ Aerotropolis Atlanta
・ Aerotrén
・ Aerotucán
・ Aerotur-KZ Airlines
・ Aerotypia
・ Aerotécnica
・ Aerotécnica AC-12
・ Aerotécnica AC-14
・ AeroUnion


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Aerotrain (KLIA) : ウィキペディア英語版
Aerotrain (KLIA)

The Aerotrain is an automated people mover (APM) system located within the Kuala Lumpur International Airport in Malaysia.
Opened in 1998 along with the airport, the Aerotrain system consists of two stations, one in the Main Terminal Building and the other in Satellite Building A. The system is the only means of transport for passengers between the two terminals.
Upgrading works on the Aerotrain had caused the service to be suspended between November 1, 2010 and March 15, 2011. Passengers were transferred between the Main Terminal Building and the Satellite Building by bus shuttles during the upgrading period.〔(Temporary Closure of Aerotrain Service at KLIA to allow upgrading of Facility )〕
==General information==
The Aerotrain is fully automated and driverless. Usually, two trains ply between the two stations. In accordance with the Spanish solution, when the train reaches the platform, the exit doors will open first for passengers to disembark, after which the entrance door on the other side will open.
Part of the train track goes underground to cross the taxiway. The ride between the Main Terminal Building and Satellite Terminal A takes about 2.5 minutes.
The Aerotrain supported various operating modes such as Synchronized Double Shuttle Mode, Offset synchronized Double Shuttle Mode, Unsynchronized Double Shuttle Mode, Single Shuttle Mode, On-Call Mode, Test Train Mode and lastly Out Of Service Mode. The Aerotrain has 4 major sub-systems which is the Central Control System, Vehicle System, Station Automatic Train Operation (ATO) System and Power Distribution System (PDS). The trains have an operating speed of 56 km/h with a 3-phase 600V power supply at 50 Hz. A 100 hp DC Electric Motor constitutes the propulsion system of the trains.
The maintenance of the Aerotrain is scheduled at 1000hrs till 1200hrs and 0000hrs till 0500hrs everyday. During those periods, only one of the trains will be running for operation and the other one will undergo maintenance works and safety checks. The frequency of the train decreases from every 2.5 minutes to every 5 minutes during the maintenance periods.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Aerotrain (KLIA)」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.